{"id":2369,"date":"2026-11-04T08:00:00","date_gmt":"2026-11-04T08:00:00","guid":{"rendered":"https:\/\/junnengelectric.com\/?p=2369"},"modified":"2026-10-22T04:56:12","modified_gmt":"2026-10-22T04:56:12","slug":"adss-cable-span-selection","status":"publish","type":"post","link":"https:\/\/junnengelectric.com\/vi\/adss-cable-span-selection\/","title":{"rendered":"L\u1ef1a ch\u1ecdn nh\u1ecbp c\u00e1p ADSS: Ph\u00f9 h\u1ee3p v\u1edbi \u0111i\u1ec1u ki\u1ec7n nh\u1ecbp tr\u00ean kh\u00f4ng v\u1edbi th\u1ef1c t\u1ebf"},"content":{"rendered":"<div class=\"wp-block-rank-math-toc-block\" id=\"rank-math-toc\"><h2>M\u1ee5c l\u1ee5c<\/h2><nav><ul><li class=\"\"><a href=\"#decision\">ADSS cable span selection: define the decision before the RFQ<\/a><\/li><li class=\"\"><a href=\"#review-records\">Chu\u1ea9n b\u1ecb ba h\u1ed3 s\u01a1 \u0111\u00e1nh gi\u00e1 c\u1ee5 th\u1ec3 c\u1ee7a d\u1ef1 \u00e1n<\/a><\/li><li class=\"\"><a href=\"#comparison\">So s\u00e1nh c\u00e1c tuy\u1ebfn \u0111\u01b0\u1eddng \u0111\u1eb7c \u0111i\u1ec3m k\u1ef9 thu\u1eadt tr\u00ean c\u00f9ng m\u1ed9t<\/a><\/li><li class=\"\"><a href=\"#project-scenario\">\u0110i qua m\u1ed9t quy\u1ebft \u0111\u1ecbnh d\u1ef1 \u00e1n tr\u01b0\u1edbc khi \u0111\u1eb7t h\u00e0ng<\/a><\/li><li class=\"\"><a href=\"#technical-5\">Review tensile load through the complete installation route<\/a><\/li><li class=\"\"><a href=\"#technical-8\">Use drum lengths to control joints and waste<\/a><\/li><li class=\"\"><a href=\"#technical-11\">Check accessory compatibility before buying the cable<\/a><\/li><li class=\"\"><a href=\"#technical-12\">Verify the route survey before fixing the construction<\/a><\/li><li class=\"\"><a href=\"#inspection-release\">Bi\u1ebfn vi\u1ec7c xem x\u00e9t th\u00e0nh m\u1ed9t k\u1ebf ho\u1ea1ch ki\u1ec3m tra v\u00e0 ph\u00e1t h\u00e0nh<\/a><\/li><li class=\"\"><a href=\"#enquiry\">Chu\u1ea9n b\u1ecb m\u1ed9t cu\u1ed9c \u0111i\u1ec1u tra t\u1eadp trung cho Junneng Electric<\/a><\/li><li class=\"\"><a href=\"#faq\">Nh\u1eefng c\u00e2u h\u1ecfi th\u01b0\u1eddng g\u1eb7p<\/a><\/li><\/ul><\/nav><\/div>\n\n\n<p class=\"wp-block-paragraph\">A distribution-line operator is adding an independent fiber route. This guide examines ADSS cable span selection in the context of matching aerial cable to actual span conditions. The specific failure to prevent is that the span number in a model code is accepted without checking wind and ice assumptions.<\/p>\n\n\n<p class=\"wp-block-paragraph\">An ADSS span designation needs the environmental and mechanical assumptions behind it. Compare wind, ice where relevant, temperature, cable mass and attachment loads for the actual spans. A model suffix resembling a distance should not be treated as proof that the cable is suitable for every span of that length.<\/p>\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"800\" src=\"https:\/\/junnengelectric.com\/wp-content\/uploads\/2026\/09\/All-Dielectric-Self-Supporting-ADSS-Aerial-Optical-Cable.jpg\" alt=\"ADSS cable span selection: All-Dielectric Self-Supporting (ADSS) Aerial Optical Cable construction diagram\" class=\"wp-image-1777\" srcset=\"https:\/\/junnengelectric.com\/wp-content\/uploads\/2026\/09\/All-Dielectric-Self-Supporting-ADSS-Aerial-Optical-Cable.jpg 800w, https:\/\/junnengelectric.com\/wp-content\/uploads\/2026\/09\/All-Dielectric-Self-Supporting-ADSS-Aerial-Optical-Cable-300x300.jpg 300w, https:\/\/junnengelectric.com\/wp-content\/uploads\/2026\/09\/All-Dielectric-Self-Supporting-ADSS-Aerial-Optical-Cable-150x150.jpg 150w, https:\/\/junnengelectric.com\/wp-content\/uploads\/2026\/09\/All-Dielectric-Self-Supporting-ADSS-Aerial-Optical-Cable-768x768.jpg 768w, https:\/\/junnengelectric.com\/wp-content\/uploads\/2026\/09\/All-Dielectric-Self-Supporting-ADSS-Aerial-Optical-Cable-600x600.jpg 600w, https:\/\/junnengelectric.com\/wp-content\/uploads\/2026\/09\/All-Dielectric-Self-Supporting-ADSS-Aerial-Optical-Cable-100x100.jpg 100w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n<h2 class=\"wp-block-heading\" id=\"decision\">ADSS cable span selection: define the decision before the RFQ<\/h2>\n\n\n<p class=\"wp-block-paragraph\">The decision is matching aerial cable to actual span conditions. A technically useful enquiry should describe the operating situation, the physical interface and the result the owner needs to accept. For ADSS cable span selection, the central risk is specific: the span number in a model code is accepted without checking wind and ice assumptions. A catalog name or a general compliance statement cannot resolve that uncertainty by itself.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"review-records\">Chu\u1ea9n b\u1ecb ba h\u1ed3 s\u01a1 \u0111\u00e1nh gi\u00e1 c\u1ee5 th\u1ec3 c\u1ee7a d\u1ef1 \u00e1n<\/h2>\n\n\n<p class=\"wp-block-paragraph\"><strong>1. Span-by-span length.<\/strong> Identify the project requirement for span-by-span length and its controlling document. Keep the response linked to the All-Dielectric Self-Supporting (ADSS) Aerial Optical Cable construction being evaluated.<\/p>\n\n\n<p class=\"wp-block-paragraph\"><strong>2. Climatic load envelope.<\/strong> Compare the offered climatic load envelope with the actual site and equipment interface. Keep the response linked to the All-Dielectric Self-Supporting (ADSS) Aerial Optical Cable construction being evaluated.<\/p>\n\n\n<p class=\"wp-block-paragraph\"><strong>3. Pole attachment capacity.<\/strong> Name the party responsible for approving pole attachment capacity and retaining the acceptance record. Keep the response linked to the All-Dielectric Self-Supporting (ADSS) Aerial Optical Cable construction being evaluated.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"comparison\">So s\u00e1nh c\u00e1c tuy\u1ebfn \u0111\u01b0\u1eddng \u0111\u1eb7c \u0111i\u1ec3m k\u1ef9 thu\u1eadt tr\u00ean c\u00f9ng m\u1ed9t<\/h2>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Tuy\u1ebfn \u0111\u01b0\u1eddng quy\u1ebft \u0111\u1ecbnh<\/th><th>Nh\u1eefng g\u00ec n\u00f3 thi\u1ebft l\u1eadp<\/th><th>Nh\u1eefng g\u00ec v\u1eabn c\u1ea7n xem x\u00e9t<\/th><\/tr><\/thead><tbody><tr><td>M\u00f4 t\u1ea3 catalog<\/td><td>Identifies a starting family for ADSS cable span selection<\/td><td>Does not settle span-by-span length or the site interface<\/td><\/tr><tr><td>\u01afu \u0111\u00e3i d\u00e0nh ri\u00eang cho d\u1ef1 \u00e1n<\/td><td>States the proposed span-by-span length and climatic load envelope<\/td><td>Needs supporting evidence and approval of pole attachment capacity<\/td><\/tr><tr><td>\u0110\u01b0\u1eddng c\u01a1 s\u1edf mua h\u00e0ng \u0111\u01b0\u1ee3c ph\u00ea duy\u1ec7t<\/td><td>Connects span-by-span length, climatic load envelope and pole attachment capacity to the same revision<\/td><td>Ph\u1ea3i ph\u00f9 h\u1ee3p v\u1edbi danh t\u00ednh \u0111\u01b0\u1ee3c ph\u00e2n ph\u1ed1i v\u00e0 c\u00e0i \u0111\u1eb7t cu\u1ed1i c\u00f9ng<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h2 class=\"wp-block-heading\" id=\"project-scenario\">\u0110i qua m\u1ed9t quy\u1ebft \u0111\u1ecbnh d\u1ef1 \u00e1n tr\u01b0\u1edbc khi \u0111\u1eb7t h\u00e0ng<\/h2>\n\n\n<p class=\"wp-block-paragraph\">Consider a hypothetical review meeting for this application: a distribution-line operator is adding an independent fiber route. The buyer has an initial offer for All-Dielectric Self-Supporting (ADSS) Aerial Optical Cable, but the concern remains that the span number in a model code is accepted without checking wind and ice assumptions. Instead of accepting the offer as complete, the team requests the document controlling span-by-span length and asks the supplier to show where the offered construction addresses it.<\/p>\n\n\n<p class=\"wp-block-paragraph\">The next step is to compare that response with climatic load envelope. If the two are incompatible, the team identifies the affected drawing or interface and requests a revised proposal. It then checks pole attachment capacity against the revision before release. This sequence makes the ADSS cable span selection decision traceable: the final choice is supported by consistent evidence, and the reason for any change is preserved for the installer and owner.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"technical-5\">Review tensile load through the complete installation route<\/h2>\n\n\n<p class=\"wp-block-paragraph\">The pulling or supporting arrangement must transmit load through components designed for that purpose. Identify the cable&#x27;s approved load-bearing elements and the permitted installation method. Optical fibers themselves must not become the unintended load path. Route bends, elevation changes, friction and handling arrangements can increase stress beyond what a simple straight-line distance suggests.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Request the installation tension limit and the conditions behind it, then have the installation contractor prepare a route-specific method statement. For aerial systems, service tension, sag and structural loading belong in the engineered route design. For ducted or indoor systems, review guides, pulling attachments and supports at transitions. Keep the selected cable and hardware data consistent. If the field route changes, reassess the affected section instead of assuming that the original installation plan remains valid.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"technical-8\">Use drum lengths to control joints and waste<\/h2>\n\n\n<p class=\"wp-block-paragraph\">Drum length affects more than freight. It determines where joints occur, how much spare cable is available and whether the installation can be completed through the planned access points. Build the delivery schedule from route chainage, endpoint allowances and accessible joint positions. Include permitted manufacturing length tolerance and the way actual lengths will be identified at delivery.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Compare a route-based cutting plan with a standard-stock proposal. Standard lengths may be convenient, but a short leftover section can force an additional joint in a poor location. Conversely, an oversized drum may be difficult to transport or unload near the route. Record the drum identifier against its intended section before dispatch. Where several drums are needed, agree how fiber identification continues between sections and keep surplus lengths identifiable for repair use rather than treating every offcut as equivalent spare cable.<\/p>\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img decoding=\"async\" width=\"1000\" height=\"750\" src=\"https:\/\/junnengelectric.com\/wp-content\/uploads\/2026\/08\/junneng-app-real-optical-fiber-1000x750-1.webp\" alt=\"All-Dielectric Self-Supporting (ADSS) Aerial Optical Cable: supporting product or application illustration for ADSS cable span selection\" class=\"wp-image-1062\" srcset=\"https:\/\/junnengelectric.com\/wp-content\/uploads\/2026\/08\/junneng-app-real-optical-fiber-1000x750-1.webp 1000w, https:\/\/junnengelectric.com\/wp-content\/uploads\/2026\/08\/junneng-app-real-optical-fiber-1000x750-1-300x225.webp 300w, https:\/\/junnengelectric.com\/wp-content\/uploads\/2026\/08\/junneng-app-real-optical-fiber-1000x750-1-768x576.webp 768w, https:\/\/junnengelectric.com\/wp-content\/uploads\/2026\/08\/junneng-app-real-optical-fiber-1000x750-1-600x450.webp 600w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n<h2 class=\"wp-block-heading\" id=\"technical-11\">Check accessory compatibility before buying the cable<\/h2>\n\n\n<p class=\"wp-block-paragraph\">Cable performance depends partly on the components used to support, protect and terminate it. Build an accessory list that matches the offered cable diameter, construction and route conditions. Depending on the application, this may include aerial fittings, joint enclosures, glands, breakout protection, splice trays or indoor termination equipment. Similar names and visual appearance do not establish interchangeability.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Obtain written confirmation of compatibility from the responsible supplier or designer. Check available space, environmental capability and the method by which mechanical load transfers through the accessory. The bill of materials should identify quantities by route section or endpoint rather than leaving a general allowance. When an accessory is substituted after approval, review the affected cable limits and installation detail. Buying cable first and solving all fittings later makes it harder to compare quotations and increases the chance of mismatched site materials.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"technical-12\">Verify the route survey before fixing the construction<\/h2>\n\n\n<p class=\"wp-block-paragraph\">Route assumptions determine the cable specification. Record whether each section is aerial, ducted, buried, indoor or inside power equipment. Note changes in elevation, access restrictions, water exposure and foreseeable interference from other services. For an existing route, distinguish measured conditions from information copied from old drawings. A drawing can show a duct that is no longer usable or an entry point that has been obstructed by later work.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Flag unresolved sections in the RFQ and agree who will verify them. A representative site survey or installation trial is often more informative than selecting a nominally stronger cable without understanding the constraint. Preserve the route information supplied to each bidder so later quotation differences can be explained. If the final alignment differs, assess the implications for drum length, joints, mechanical loading and optical budget before manufacturing or releasing the affected cable.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"inspection-release\">Bi\u1ebfn vi\u1ec7c xem x\u00e9t th\u00e0nh m\u1ed9t k\u1ebf ho\u1ea1ch ki\u1ec3m tra v\u00e0 ph\u00e1t h\u00e0nh<\/h2>\n\n\n<p class=\"wp-block-paragraph\">Before releasing ADSS cable span selection for manufacture or dispatch, reconcile the quotation, approved drawings and inspection scope. The records for span-by-span length, climatic load envelope and pole attachment capacity should identify the same product and revision. List the evidence required from the supplier and the checks that remain with the site contractor. Resolve exceptions in writing, including who accepts the proposed deviation.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Tham kh\u1ea3o n\u1ec1n: <a href=\"https:\/\/www.itu.int\/epublications\/publication\/itu-t-g-652-2024-08-characteristics-of-a-single-mode-optical-fibre-and-cable\" target=\"_blank\" rel=\"noopener noreferrer\">ITU-T single-mode fibre framework<\/a>. X\u00e1c nh\u1eadn c\u00e1c y\u00eau c\u1ea7u \u00e1p d\u1ee5ng cho d\u1ef1 \u00e1n; li\u00ean k\u1ebft n\u00e0y kh\u00f4ng thi\u1ebft l\u1eadp ch\u1ee9ng nh\u1eadn cho m\u1ed9t s\u1ea3n ph\u1ea9m ri\u00eang l\u1ebb.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"enquiry\">Chu\u1ea9n b\u1ecb m\u1ed9t cu\u1ed9c \u0111i\u1ec1u tra t\u1eadp trung cho Junneng Electric<\/h2>\n\n\n<p class=\"wp-block-paragraph\">Send Junneng Electric the application, quantity, required delivery window and the drawings or data needed to confirm span-by-span length, climatic load envelope and pole attachment capacity. Ask for a written ADSS cable span selection proposal with a clear construction, interface and inspection scope. Where technical details are still preliminary, identify them so they can be reviewed before order approval.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Kh\u00e1m ph\u00e1 c\u00e1c <a href=\"https:\/\/junnengelectric.com\/vi\/san-pham\/tat-ca-cac-quang-cao-tu-ho-tro-dien-moi-cap-quang-tren-khong\/\">All-Dielectric Self-Supporting (ADSS) Aerial Optical Cable product page<\/a>, c\u00e1i <a href=\"https:\/\/junnengelectric.com\/vi\/danh-muc-san-pham\/soi-quang\/\">Optical Fiber range<\/a> v\u00e0 c\u1ee7a Junneng <a href=\"https:\/\/junnengelectric.com\/vi\/giai-phap\/\">\u0111\u00e1nh gi\u00e1 y\u00eau c\u1ea7u v\u00e0 d\u1ecbch v\u1ee5 h\u1ed7 tr\u1ee3 d\u1ef1 \u00e1n<\/a>. Use the form below to discuss ADSS cable span selection and confirm the quotation scope.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"faq\">Nh\u1eefng c\u00e2u h\u1ecfi th\u01b0\u1eddng g\u1eb7p<\/h2>\n\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list\">\n<div id=\"faq-009-1\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What should a buyer confirm when reviewing ADSS cable span selection?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Begin with span-by-span length, then check how it interacts with climatic load envelope and pole attachment capacity. These inputs define the application more clearly than the product name alone. Provide the actual project drawing or operating information and request an offered construction that addresses it.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-009-2\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">R\u1ee7i ro \u1ee9ng d\u1ee5ng ch\u00ednh c\u1ea7n tr\u00e1nh l\u00e0 g\u00ec?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>The main risk is that the span number in a model code is accepted without checking wind and ice assumptions. Prevent it by resolving the specific interface before order release and preserving the supporting evidence. If a bidder proposes a different arrangement, review the consequences with the responsible designer.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-009-3\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Can ADSS cable span selection be approved from a catalog listing?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>A catalog listing is a starting point. The final review needs the proposed All-Dielectric Self-Supporting (ADSS) Aerial Optical Cable construction, relevant drawings and evidence for span-by-span length and climatic load envelope. Clarify any conflicting model code, dimension or material description before purchasing.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-009-4\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Nh\u1eefng b\u1ea3n ghi n\u00e0o c\u1ea7n thi\u1ebft tr\u01b0\u1edbc khi ph\u00e1t h\u00e0nh \u0111\u01a1n h\u00e0ng<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Keep the approved specification, final drawing revision, product or batch identity, agreed inspection evidence and the record for pole attachment capacity. Define factory and site responsibilities separately so the owner can trace the supplied item through installation and handover.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-009-5\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Junneng c\u00f3 th\u1ec3 h\u1ed7 tr\u1ee3 d\u1ef1 \u00e1n n\u00e0y nh\u01b0 th\u1ebf n\u00e0o?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Send the application, quantity, delivery plan and project information for span-by-span length, climatic load envelope and pole attachment capacity. Request model-selection and quotation support with explicit assumptions, technical qualifications and the documents needed for approval. Confirm any installation or testing service in the agreed scope.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class='fluentform ff-default fluentform_wrapper_1 ffs_default_wrap'><form data-form_id=\"1\" id=\"fluentform_1\" class=\"frm-fluent-form fluent_form_1 ff-el-form-top ff_form_instance_1_1 ff-form-loading ffs_default\" data-form_instance=\"ff_form_instance_1_1\" method=\"POST\" action=\"\" ><fieldset  style=\"border: none!important;margin: 0!important;padding: 0!important;background-color: transparent!important;box-shadow: none!important;outline: none!important; min-inline-size: 100%;\">\n                    <legend class=\"ff_screen_reader_title\" style=\"display: block; margin: 0!important;padding: 0!important;height: 0!important;text-indent: -999999px;width: 0!important;overflow:hidden;\">\u5b98\u7f51\u8be2ch\u1ebf \u0111\u1ed9<\/legend>        <div\n                style=\"display: none!important; position: absolute!important; transform: translateX(1000%)!important;\"\n                class=\"ff-el-group ff-hpsf-container\"\n        >\n            <div class=\"ff-el-input--label asterisk-right\">\n                <label for=\"ff_1_item_sf\" aria-label=\"B\u1ea3n tin\">\n                    B\u1ea3n tin                <\/label>\n            <\/div>\n            <div class=\"ff-el-input--content\">\n                <input type=\"text\"\n                       name=\"item_1__fluent_sf\"\n                       class=\"ff-el-form-control\"\n                       id=\"ff_1_item_sf\"\n                \/>\n            <\/div>\n        <\/div>\n        <input type='hidden' name='__fluent_form_embded_post_id' value='2369' \/><input type=\"hidden\" id=\"_fluentform_1_fluentformnonce\" name=\"_fluentform_1_fluentformnonce\" value=\"5a95fc1a5e\" \/><input type=\"hidden\" name=\"_wp_http_referer\" value=\"\/vi\/wp-json\/wp\/v2\/posts\/2369\" \/><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_1_input_text' id='label_ff_1_input_text' aria-label=\"T\u00ean\">T\u00ean<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"input_text\" class=\"ff-el-form-control\" placeholder=\"T\u00ean\" data-name=\"input_text\" id=\"ff_1_input_text\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_1_email' id='label_ff_1_email' aria-label=\"Th\u01b0 \u0111i\u1ec7n t\u1eed\">Th\u01b0 \u0111i\u1ec7n t\u1eed<\/label><\/div><div class='ff-el-input--content'><input type=\"email\" name=\"email\" id=\"ff_1_email\" class=\"ff-el-form-control\" placeholder=\"\u0110\u1ecba ch\u1ec9 Email\" data-name=\"email\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_1_phone' id='label_ff_1_phone' aria-label=\"\u0110i\u1ec7n tho\u1ea1i\/Di \u0111\u1ed9ng\">\u0110i\u1ec7n tho\u1ea1i\/Di \u0111\u1ed9ng<\/label><\/div><div class='ff-el-input--content'><input name=\"phone\" class=\"ff-el-form-control ff-el-phone\" type=\"tel\" placeholder=\"S\u1ed1 Mobile\" data-name=\"phone\" id=\"ff_1_phone\" inputmode=\"tel\"  aria-invalid='false' aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_1_message' id='label_ff_1_message' aria-label=\"Tin nh\u1eafn c\u1ee7a b\u1ea1n\">Tin nh\u1eafn c\u1ee7a b\u1ea1n<\/label><\/div><div class='ff-el-input--content'><textarea aria-required=\"true\" aria-labelledby=\"label_ff_1_message\" name=\"message\" id=\"ff_1_message\" class=\"ff-el-form-control\" placeholder=\"Tin nh\u1eafn c\u1ee7a b\u1ea1n\" rows=\"4\" cols=\"2\" data-name=\"message\" ><\/textarea><\/div><\/div><div class='ff-el-group ff-text-left ff_submit_btn_wrapper'><button type=\"submit\" class=\"ff-btn ff-btn-submit ff-btn-md ff_btn_style\"  aria-label=\"N\u1ed9p Form\">N\u1ed9p Form<\/button><\/div><\/fieldset><input type=\"hidden\" name=\"trp-form-language\" value=\"vi\"\/><\/form><div id='fluentform_1_errors' class='ff-errors-in-stack ff_form_instance_1_1 ff-form-loading_errors ff_form_instance_1_1_errors'><\/div><\/div>            <script type=\"text\/javascript\">\n                window.fluent_form_ff_form_instance_1_1 = {\"id\":\"1\",\"ajaxUrl\":\"https:\\\/\\\/junnengelectric.com\\\/wp-admin\\\/admin-ajax.php\",\"settings\":{\"layout\":{\"labelPlacement\":\"top\",\"helpMessagePlacement\":\"with_label\",\"errorMessagePlacement\":\"inline\",\"cssClassName\":\"\",\"asteriskPlacement\":\"asterisk-right\"},\"restrictions\":{\"denyEmptySubmission\":{\"enabled\":false}}},\"form_instance\":\"ff_form_instance_1_1\",\"form_id_selector\":\"fluentform_1\",\"rules\":{\"input_text\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"email\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"},\"email\":{\"value\":true,\"message\":\"This field must contain a valid email\",\"global\":false,\"global_message\":\"This field must contain a valid email\"}},\"phone\":{\"required\":{\"value\":true,\"global\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\"},\"valid_phone_number\":{\"value\":false,\"global\":true,\"message\":\"Phone number is not valid\",\"global_message\":\"Phone number is not valid\"}},\"message\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"}}},\"debounce_time\":300,\"file_upload_settings\":[]};\n                            <\/script>","protected":false},"excerpt":{"rendered":"<p>Xem x\u00e9t l\u1ef1a ch\u1ecdn kho\u1ea3ng c\u00e1p ADSS: \u0111\u1ea7u v\u00e0o d\u1ef1 \u00e1n, \u0111\u1eb7c \u0111i\u1ec3m k\u1ef9 thu\u1eadt, giao di\u1ec7n v\u00e0 b\u1eb1ng ch\u1ee9ng ch\u1ea5p nh\u1eadn. chu\u1ea9n b\u1ecb RFQ c\u1ee7a b\u1ea1n v\u1edbi Junneng Electric.<\/p>","protected":false},"author":1,"featured_media":1777,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","rank_math_title":"ADSS cable span selection | Buyer Guide","rank_math_description":"Review ADSS cable span selection: project inputs, specification, interfaces and acceptance evidence. Prepare your RFQ with Junneng Electric.","rank_math_canonical_url":"https:\/\/junnengelectric.com\/adss-cable-span-selection\/","rank_math_focus_keyword":"ADSS cable span selection"},"categories":[33],"tags":[],"class_list":["post-2369","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/junnengelectric.com\/vi\/wp-json\/wp\/v2\/posts\/2369","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/junnengelectric.com\/vi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/junnengelectric.com\/vi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/junnengelectric.com\/vi\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/junnengelectric.com\/vi\/wp-json\/wp\/v2\/comments?post=2369"}],"version-history":[{"count":1,"href":"https:\/\/junnengelectric.com\/vi\/wp-json\/wp\/v2\/posts\/2369\/revisions"}],"predecessor-version":[{"id":2371,"href":"https:\/\/junnengelectric.com\/vi\/wp-json\/wp\/v2\/posts\/2369\/revisions\/2371"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/junnengelectric.com\/vi\/wp-json\/wp\/v2\/media\/1777"}],"wp:attachment":[{"href":"https:\/\/junnengelectric.com\/vi\/wp-json\/wp\/v2\/media?parent=2369"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/junnengelectric.com\/vi\/wp-json\/wp\/v2\/categories?post=2369"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/junnengelectric.com\/vi\/wp-json\/wp\/v2\/tags?post=2369"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}